The Independent Electricity System Operator (IESO) released its resource adequacy update, providing final results from the Expedited Long-Term Request for Proposals (E-LT RFP) and Same Technology Upgrades (Same Tech). The results are an update from the previous month’s results and include the weighted average price of the procurement. Through the E-LT RFP, the IESO has procured 930 MW of storage and 318.5 MW of gas-fired generation.
Read Full ReportRecent legislation in Maryland increasing the state’s offshore wind goal to 8.5 GW by 2031 strengthens offtake opportunities for BOEM’s Central Atlantic lease area. This is a significant increase from the 2019 goal set through the Clean Energy Jobs Act of 1.2 GW by 2030.
Read Full ReportIn May the Independent Electricity System Operator (IESO) released initial results from the Expedited Long-Term Request for Proposals (E-LT 1 RFP), procuring 318.5 MW of gas-fired generation and roughly 780 MW of battery storage under the Category 1 storage category. Additional storage capacity is likely to follow from the so-called Category 2 storage proposals, i.e., those proposals whose price exceeded an undisclosed IESO threshold and which were referred to the Canadian Infrastructure Bank (CIB) to seek potential price reductions through lower project financing costs.
Read Full ReportEfficiency between markets is determined by the interplay of prices and costs. When one market offers lower prices compared to another, it tends to export more power, while higher prices result in increased power imports. Thus, a positive correlation is expected between prices and imports, and a negative correlation between prices and exports.
Read Full ReportBC Hydro filed its Signpost Update for their 2021 Integrated Resource Plan (2021 IRP) with the BC Utilities Commission (BCUC). As the name suggest, the Signpost Update updates the 2021 IRP to reflect changes in system needs that go beyond the capabilities of Near-Term actions.
Read Full ReportThe Independent Electricity System Operator (IESO) has released initial results from the Expedited Long-Term Request for Proposals (E-LT RFP), procuring 318.5 MW of gas-fired generation under the non-storage category and roughly 780 MW under the Category 1 storage category.
Read Full ReportThe amount of operational battery storage in New York is relatively small but poised for significant growth. A New York Public Service Commission press release indicated that just 130 megawatts of energy storage in total was operating in the state as of November 2022. A wide variety of incentive programs, such as the Bridge Incentive program, have supported these projects.
Read Full ReportOn April 26 at the Ontario Energy Association Speaker Event in Toronto, Jason Chee-Aloy (Managing Director) delivered a proposal for clean energy corporate PPAs in Ontario and described how such PPAs are increasingly driving development of renewable electricity supply and economic development across multiple jurisdictions.
Read Full ReportWe have been asked repeatedly how Battery Energy Storage Systems (BESS) (“storage”) will operate in Ontario’s wholesale energy market in the coming years, which led us to ask: what goes into a storage offer anyway?
Read Full Report